§ 51.069 Disposal of On-Site Wastes

(A) On-site disposal waste. Charges for dumping on-site disposal wastes at the city's sewage treatment plant shall be based on the measured gallonage deposited. These charges shall cover costs of operation and maintenance of the treatment plant and any appropriate local capital costs allocable to the treatment of these wastes and shall be in accord with the resolution of the City Council adopting rates for this class of use.

(B) Hours. Hours for acceptance and locations for disposal of on-site wastes shall be established by the city. No waste will be accepted for disposal at any other time or location.

(C) Samples. Prior to depositing, a sample of waste proposed to be deposited shall be taken. If there is no biological activity in the waste, or if any constituent of the waste is identified which violates the provisions of this chapter for deposit in public sewers, the waste will be rejected.

(D) Restrictions. The city may establish maximum volume and strength restrictions on deposited waste. Any restrictions shall be promulgated in writing to the depositors of the waste.

(E) Violations. Any waste deposited which violates the terms of this subchapter, shall be removed by the city with all costs of personnel, equipment, and damages assessed to the depositor.

(Ord. 1737, passed 6-24-91) Penalty, see § 51.999