Water Rates, Fees and Charges
As of August 1, 2008
|
$12.44
|
first 3,000 gallons | minimum charge |
|
$0.94
|
each 1,000 gallons next 10,000 gallons | 3,001 through 13,000 |
|
$0.78
|
each 1,000 gallons over 13,001 gallons |
As of July 1, 2009
|
$13.44
|
first 3,000 gallons | minimum charge |
|
$1.02
|
each 1,000 gallons next 10,000 gallons | 3,001 through 13,000 |
|
$0.84
|
each 1,000 gallons over 13,001 gallons |
As of July 1, 2010
|
$14.65
|
first 3,000 gallons | minimum charge |
|
$1.11
|
each 1,000 gallons next 10,000 gallons | 3,001 through 13,000 |
|
$0.92
|
each 1,000 gallons over 13,001 gallons |
For relief of those residents who are experiencing a financial hardship, application may be made to the city recorder for a reduced monthly charge calculated at 50% of the minimum charge as established above.
Special water use from a fire hydrant, upon arrival of the water superintendent, shall be charged at two times the water rate in effect, based on the water rates established above.
A $25 account set up fee is required for each utility connection.
Water Connection Installation Charges
| Meter Size | Connection Fees | System Development Charge | Total Fee |
| ¾” | $900.00 | $504.00 | $1,404.00 |
| 1” | $1,000.00 | $1,260.00 | $2,260.00 |
| 1 ½” | $2,100.00 | $2,520.00 | $4,620.00 |
| 2” | $3,100.00 | $4,032.00 | $7,132.00 |
| 3” | $4,700.00 | $8,064.00 | $12,764.00 |
| 4” | $5,800.00 | $12,600.00 | $18,400.00 |
There is a $25.00 account set up fee added to each meter installation. This charge is payable at the time of permit purchase.
Note: Additional charges may be due subject to water line installation assessment.