• Home
  • PAY MY BILL
  • Customer Service Request
  • A Great Place to Live
  • Boards & Commissions
  • City Happenings
  • Code of Ordinances
  • Community Links
  • Departments
  • Economic Development
  • Energy Services
  • Job Openings
  • Mayor & City Council
  • News/Press
  • Public Notices
  • Refund Policy
  • Vision Statement
  • Web Site Privacy Policy
  • Question/Comments?

Search

Home → Code of Ordinances → Title IX: General Regulations → Chapter 94: Streets and Sidewalks → Excavations

§ 94.45 Backfilling

(A) Selected backfill material shall be placed in trenches containing pipe simultaneously on both sides of the pipe for the full width of the trench in layers about six inches in depth and tamped thoroughly with a pneumatic tamper. The entire depth of the trench shall be thoroughly compacted with selected material and by means of hand or mechanically operated tampers, in layers of approximately six inches and shall be brought to the required surface grade without damage to the pipe.

(B) In lieu of the backfilling procedure specified above, river run gravel or crushed rock or gravel may be used for backfilling that portion of the trench more than six inches above the top of the pipe, provided the maximum size of material shall not exceed four inches in diameter and shall be of uniform graduation with 20% or more passing a ¼-inch square screen, ¾”- 0 crushed rock shall be placed in the final 12 inches of the trench and compacted in six-inch lifts, to a smooth finished grade equal to the existing surface.

(Ord. 1942, passed 11-10-97) Penalty, see § 94.99

‹ § 94.44 Depth of Structures up § 94.46 Noise, Dust and Debris ›
»
  • Printer-friendly version

City of Hermiston | 180 NE 2nd Street, Hermiston, OR 97838

Phone: (541) 567-5521 | TTY/TDD @ 1-800-735-2900

Email: city@hermiston.or.us | Content Copyright © 2007-2011

Admin Login