• Home
  • PAY MY BILL
  • Customer Service Request
  • A Great Place to Live
  • Boards & Commissions
  • City Happenings
  • Code of Ordinances
  • Community Links
  • Departments
  • Economic Development
  • Energy Services
  • Job Openings
  • Mayor & City Council
  • News/Press
  • Public Notices
  • Refund Policy
  • Vision Statement
  • Web Site Privacy Policy
  • Question/Comments?

Search

Home → Code of Ordinances → Title IX: General Regulations → Chapter 94: Streets and Sidewalks → Driveway Construction

§ 94.69 Construction Requirements

In addition to the rules, regulations, and specifications promulgated by the City Engineer with respect to driveway approaches, the following requirements shall be complied with in the work done under the provisions of this subchapter.

(A) The outside of the driveway approach shall be a straight grade from the top of the curb to the grade of the outside sidewalk line.

(B) No curb cuts shall be made beyond any property line as projected except when consented to in writing by the adjoining property owner involved.

(C) The top of the paving of the driveway slab at the back of the curb line shall be 1e inches above the flow line of the gutter and shall slope in a straight line to the flow line of the gutter, and shall be constructed in a manner that will not interfere with or obstruct the drainage in the street.

(D) The owner and contractor shall protect the public from injury or damage during the construction of driveway approaches, and it is herein stipulated, as an essential condition of the issuance of a permit, that the city shall not be liable for damage which may arise from the prosecution of work.

(Ord. 490, passed 8-23-63) Penalty, see § 94.99

‹ § 94.68 Supervision of Construction up § 94.70 Approach Classification, Width and Location ›
»
  • Printer-friendly version

City of Hermiston | 180 NE 2nd Street, Hermiston, OR 97838

Phone: (541) 567-5521 | TTY/TDD @ 1-800-735-2900

Email: city@hermiston.or.us | Content Copyright © 2007-2011

Admin Login