Page not found

Search results

  1. Fee Schedule

    Community Development | Page

    307.63 289.42 280.47 298.24 268.37 259.83 A-1 Assembly, theaters, without stage 310.12 298.70 291.00 ... 237.19 218.26 210.31 227.80 197.22 189.68 A-4 Assembly, arenas 309.12 297.70 289.00 277.87 258.66 250.71 ... Building Permit Fee $1.00 to $500.00 $ 63.00 minimum $500.01 to $2,000.00 $ 63.00 for the first $500.00 ...

  2. Electrical Permit

    Community Development | Page

    above, per inspection $ 86.00 A) Enter total of above fees $ B) Enter 12% Surcharge (.12 x A) $ C) Plan ... ea. Sum 5 kva or less $79.00 $ 5.01 to 15 kva $94.00 $ 15.01 to 25 kva $156.00 $ solar each additional ... kva25.o1 to 100 kva $6.24 $ Wind 25.01 to 50 kva $204.00 $ Wind 50.01 to 100 kva(*) Max fee $469.00 ...

  3. Total Residential Utility Burden: Benchmark Analysis

    Public Works | Page

    Z total_residential_utility_burden_report_update_1.pdf Total Residential Utility Burden Benchmark Analysis: Update December 29, 2014 Prepared by: Mark ... purposes. All other rates represent current rates as of December 29, 2014. Methodology Due to differences in ... relate to each other. All rates shown in this report were current as of December 29, 2014, unless ...

  4. Urban Renewal Feasibility Study

    Community Development | Page

    Tax Year Low Growth Medium Growth 2011‐12 $0 $0 2012‐13 $11,170 $18,616 2013‐14 $22,440 $37,585 2014 ... within an Urban Renewal District to no more than 25% of the total municipal assessed value. To this  end, a review of 2011/12 ...   Hermiston Urban Renewal Feasibility Study  City of Hermiston, November 2012    12    To  forecast  potential  future  taxable  assessed  ...

  5. Urban Renewal Report

    Community Development | Page

    income is slightly lower. The local median income is roughly 12% lower than the statewide median income. ... 37% 16% 8% 3% 12% 0% 10% 20% 30% 40% Natural Resources & Mining Construction Manufacturing ... RENEWAL REPORT 12 3. Jump-Start Loans Loans to private property owners to assist in the physical ...

  6. 2018

    Community Development | Page

    53006-0128 920-583-3132 Printed: 2/2/18 10:12 am Page 1 of 5 Structural Permits Issued 1/1/2018 00:00:00 ... Footage: 528 Work Desc: 12' x 44' COVERED PATIO 528 SQ FT Owner (Property) OWNER: SEE PROPERTY ... 99324 509-525-9477 Printed: 2/2/18 10:12 am Page 2 of 5 Structural Permits Issued 1/1/2018 00:00:00 ...

  7. City Council Will Review Bids for City Hall Expansion

    Mayor & City Council | News/Press Release | Feb 4, 2021

    project was added to the original long-range Hermiston Urban Renewal Agency budget in 2014. HURA funds ... lot, adding 12 parking spaces. ●  Replacing two blocks of aging water and sewer lines under the alley ...

  8. 2016 Hermiston Police Department Annual Report

    Police Department | Page

    Chaplain Program 11 Services Coordinator 12 Administrative Division 13 Investigations 16 Crime/Patrol ... a dedicated staff of 27 full-time sworn officers and 12 support staff positions (some of those paid but mostly ... 8 OPERATIONS DIVISION Operations Division Patrol consists of four teams working 12 hour shifts. Each team has ...

  9. 2023 Hermiston Police Department Annual Report

    Police Department | Page

    Z 2023_hermiston_police_department_annual_report.pdf 1 1 1 2 3 3 4-5 6 7-8 9 10 11 11 12 13 14 15 16 17 18 19 20 Hermiston Police Mission ... return in the spring of 2024 where they will undergo 12-14 additional weeks of in-house training. The ... training for 7-8 months before being released on their own. Patrol consists of four teams working 12 ...

  10. 2023

    Community Development | Page

    PROTECTION CO CCB- 174536 NEW IN RACK FIRE SPRINKLER SYSTEM Commercial New 1,411,200.00 8,632.12 8,632.12 ... 0 Commercial Electrical 407-22-000056-ELEC 1/19/23 4N2809DA00500 248 NW 12TH ST, HERMISTON, OR 97838 MOOREHOUSE ... OUT LIKE FOR LIKE PACKAGE UNITS- A/C AND 60K GAS HEAT Commercial Replacement 12,000.00 105.28 105.28 ...

Pages