Page not found

Search results

  1. Core Market Demographic Report

    Community Development | Page

    In Style (5B) 2.0% 99.3% 2.3% 30.5% 89 17 The Great Outdoors (6C) 0.5% 99.8% 1.6% 32.1% 31 18 Rooted ... 2.0% 64 562 2.0% 61 Salt of the Earth (6B) 0 0.0% 0 0 0.0% 0 The Great Outdoors (6C) 61 0.5% 31 127 ... Islander Alone 0.2% 2016 Other Race 20.2% 2016 Two or More Races 3.4% 2016 Hispanic Origin (Any Race) 37.2% ...

  2. Total Residential Utility Burden: Benchmark Analysis

    Public Works | Page

    $188.05 $2,257 The Dalles $212.61 $2,551 La Grande $214.92 $2,579 Pendleton $222.57 $2,671 Total Utility ... $22.65 $23.56 $18.64 $35.30 $29.70 $38.05 $44.78 Hermiston- CURRENT Hermiston- FULL W&S Increase ... $92.08 $64.25 $- $20.00 $40.00 $60.00 $80.00 $100.00 $120.00 Hermiston Baker City Ontario Pendleton La ...

  3. Sewer Comparison

    Public Works | Page

    $35.30 $29.70 $38.05 $44.78 $23.56 $- $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00 $45.00 ... Grande $38.05 Ontario $35.30 The Dalles $44.78 ...

  4. Hermiston Parks, Recreation and Open Spaces Master Plan

    Parks and Recreation | Page

    Development Permits Hermiston; 2009 0 10 20 30 40 50 0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 60 70 80 2009 2010 2011 ... measures that guide strategic direction and development of the parks system over the next 20 years. The ... over the next 20 years. The Plan was prepared in collaboration with City of Hermiston staff, the ...

  5. TRT & TPA FORMS

    Finance & Utility Billing | Page

    PRINTED NAME: TITLE: Identification No. 05-3016-225 05-3016-230 Total from Line 9 plus Line 13 0.93 ... Identification No. 05-3016-210 1 = 2- 3- 4 = 5 x 6 = 7 = 8- 9 = 10 x 11 = 12 = 13 x 14 = 15 Outstanding ... + 19 + 20 = 21 = SIGNED NAME: PRINTED NAME: Transient Room Tax Return- Operator Total rents received ...

  6. Urban Renewal Feasibility Study

    Community Development | Page

    $44,036 $46,704 2018‐19 $44,696 $47,872 2019‐20 $45,367 $49,068 2020‐21 $46,047 $50,295 2021‐22 $46,738 ...   The proposed Urban Renewal District (URD) illustrated in Exhibit 1 has the potential to generate an  estimated total of between $2.5 million and $4.5 million in new incremental tax revenue over a 20 ...  The urban renewal plan will last 20 years;   The first tax increment revenue receipt will be in Fiscal Year 2012‐13;  ...

  7. All City Fees & Charges

    Finance & Utility Billing | Page

    or less connections) $10.00 20. Gas fuel piping outlets (more than four) $6.00 21. Heat pump $15.00 ... Ejectors/sump pump $45.00 $50.00 9. Expansion tank $20.00 $50.00 10. Fixture Cap $20.00 $20.00 11. Floor ... drain/floor sink/hub drain $25.00 $30.00 12. Garbage disposal $25.00 $30.00 13. Hose bib $20.00 $20.00 14. lce ...

  8. Core Market Neighborhood Tapestries

    Community Development | Page

    In Style (5B) 2.0% 99.3% 2.3% 30.5% 89 17 The Great Outdoors (6C) 0.5% 99.8% 1.6% 32.1% 31 18 Rooted ... 13.9% 192 7 Barrios Urbanos (7D) 4.2% 72.7% 1.0% 14.9% 403 8 Traditional Living (12B) 3.9% 76.6% 2.0 ... Living (6D) 2.4% 95.3% 1.1% 25.0% 219 15 Green Acres (6A) 2.0% 97.3% 3.2% 28.2% 64 Subtotal 13.6% 6.7% 16 ...

  9. Coordinated Population Forecast 2016-2066

    Community Development | Page

    -Areas........................................................................................................ 20 Forecast Trends ... Growth............... 24 Figure 20. Umatilla County—Age Structure of the Population (2016, 2035, and ... 0.7% Pendleton UGB 17,161 17,015-0.1% 17,325 18,359 21,607 0.3% 0.5% Pilot Rock UGB 1,641 1,576-0.4% ...

  10. Urban Renewal Report

    Community Development | Page

    2018-19 $116,971 2019-20 $137,870 2020-21 $159,207 2021-22 $180,997 2022-23 $203,255 2023-24 $225,995 ... $50,929 $45,567 $45,567 6 2018-19 $116,971 $559,497 $50,903 $66,068 $66,068 7 2019-20 $137,870 $541,394 ... 6 2018-19 1.2025 $7,734 0.1700 $1,093 0.0923 $594 0.2021 $1,300 0.0000 $0 7 2019-20 1.2025 $9,138 0.1700 ...

Pages