Page not found
Search results
-
Fee Schedule
Community Development | Pageonly buildings deduct 20 percent c. N.P = not permitted d. Unfinished basements (Group R-3) = $31 ... 237.19 218.26 210.31 227.80 197.22 189.68 A-4 Assembly, arenas 309.12 297.70 289.00 277.87 258.66 250.71 ... Building Permit Fee $1.00 to $500.00 $ 63.00 minimum $500.01 to $2,000.00 $ 63.00 for the first $500.00 ...
-
Water Quality Reports
Public Works | PageThe City of Hermiston is pleased to provide the annual Water Quality Report for each calendar ... Quality Report for calendar year 2021. Our goal has always been to provide the consumer with a safe, ... 88.9 47.4 88.9 No Tested 06/20 Erosion of natural deposits Arsenic (mg/l) 0 0.01 0.0062 ND 0.0062 No ...
-
2020
Community Development | Pagebuilding@hermiston.or.uswww.hermiston.or.us 1/1/2020 00:00:00- 1/31/2020 23:59:59 Permit: 407-19-000660-FIRE Site Addr: 855 W Highland AVE, ... 407-19-000667-STR Site Addr: 620 NW 11th ST, STE# M01-02, Hermiston, OR 97838 Valuation: $756,000.00 Parcel No: ... Permits Issued 1/1/2020 00:00:00 through 1/31/2020 23:59:59 Permit: 407-20-000004-MD Site Addr: 1248 SW ...
-
Department Annual Reports
Police Department | PageReport 2016 Hermiston Police Department Annual Report 2015 Hermiston Police Department Annual Report 2014 ... Report 2017 Hermiston Police Department Annual Report 2016 Hermiston Police Department Annual Report 2015 ... across the state and nation. We are lucky to have a dedicated staff of 31 full-time sworn officers, ...
-
2023.
Community Development | Pagebuilding@hermiston.or.uswww.hermiston.or.us 1/1/2023 00:00:00- 1/31/2023 23:59:59 Permit: 407-22-000760-STR Site Addr: 9 SE CAMPBELL DR, ... 651-251-1880 Printed: 2/1/23 2:39 pm Page 1 of 3 Structural Permits Issued 1/1/2023 00:00:00 through 1/31 ... through 1/31/2023 23:59:59 Permit: 407-23-000031-STR Site Addr: 410 NE 4TH ST, HERMISTON, OR 97838 ...
-
Notice of Public Hearing City Council February 26, 2024 Annexation & Comprehensive Plan Map Amendment Hermiston Home Works Inc 4N2813 Tax Lots 200 & 500- 1295 SE 10th St
Community Development | News/Press Release | Feb 7, 2024Industrial to Medium Density Residential for 48.3 acres and Commercial for 31.57 acres along with ... Multi-Family Residential (R-3) for 48.3 acres of land and Outlying Commercial(C-2) for 31.57 acres. The public ... West line of Section 13; thence S00 0 01”00”E along said Section line, approximately 142 feet to the ...
-
Urban Renewal Feasibility Study
Community Development | PageFIGURE 3.1: PRELIMINARY URBAN RENEWAL DISTRICT BOUNDARIES, CENTRAL HERMISTON Source: Hermiston GIS, Johnson Reid LLC The proposed preliminary Urban Renewal District ... 2013‐14 $41,490 $42,311 2014‐15 $42,112 $43,369 2015‐16 $42,744 $44,454 2016‐17 $43,385 $45,565 2017‐18 ... 2026‐27 $50,350 $58,327 2027‐28 $51,105 $59,785 2028‐29 $51,872 $61,280 2029‐30 $52,650 $62,812 2030‐31 ...
-
Electrical Permit
Community Development | Pageea. Sum 5 kva or less $79.00 $ 5.01 to 15 kva $94.00 $ 15.01 to 25 kva $156.00 $ solar each additional ... kva25.o1 to 100 kva $6.24 $ Wind 25.01 to 50 kva $204.00 $ Wind 50.01 to 100 kva(*) Max fee $469.00 ... fee: fill_28: No of itemsMiscellaneous fees hourly rate: fill_31: fill_35: fill_38: D Technology Fee ...
-
2016 Hermiston Police Department Annual Report
Police Department | Pageparticipates in numerous special events throughout the calendar year. In 2016, pa- trol officers assisted with ... 2016 Annual Report Image Slideshow Display Contact Info Block Web Page Contact Information Menu ... officer can be contacted by telephone 24 hours a day 365 days a year. 2016 Hermiston Police Department ...
-
Wetland Inventory Maps
Community Development | Page33 23 2 661122 3344 55 77 1 21 299 88 11111 01 0 1 81 8 1 31 31 41 41 71 7 1 61 6 1 51 5 1 91 9 2 42 ... Map 28 Map 29 Map 30 Map 31 Map 32 Map 33Map 26 Map 37 Map 38 Map 39 Map 40 Map 41 Map 42 Map 43 Map ... River(170701031305) Umatilla River(170701031306) 27 2928 30 32 31 3 33 3 44 4 N 2 8 E4 N 2 8 E 5 N 2 8 E5 ...